
Preah Sihanouk studies proposed Walk Street; construction dates unconfirmed
The report described a proposed pedestrian route 1,225 metres long and 3 metres wide, with food, coffee and souvenir areas. Construction dates had not been confirmed when the report was published on May 13, 2026.









